BOTHELL 183RD FIXER - WEEK 6
No pictures last week due to the snow, but the guys have been very busy whenever they were able to make it to the house. The day the pictures were taken, the texturing guy was hard at work, so everything was pretty much covered up as you can see. But underneath all that plastic, there are brand new cabinets in the bathrooms and the kitchen. The front door has been painted. Look forward to next week to see all the changes. For all pictures of this property, click here.


BELVIDERE PROJECT - WEST SEATTLE - WEEK 10
Week 10 of the Belvidere projects, and despite the snow delay there are still a bunch of changes. The new dormer was added to the master bedroom really adding the space there. Some skylights were added in the master bathroom and plumbing was put in for the new master bathroom. Also, downstairs in the basement electrical has started to go in along with a big group of canister lights. At this stage in the project there are not a lot of visible changes because its tedious a


S AUGUSTA - COSMETIC FIXER - COMPLETED!
Week 6 and all done. Appliances are in and look great and the staging is done as well making the place look really awesome inside. Outside the final touches on the landscaping were completed and the portico was completed as well. Everything is done and is ready for listing. Lets just hope this snow melts off soon!
Click here for pictures of the final product start to finish!


BOTHELL 183RD FIXER - WEEK 4
Lots of progress again this week! All the framing/wrapping on the windows is complete and everything has a fresh coat of paint. Any doors that have not been replaced by new ones have been painted. New cabinets have been installed in the upstairs bathroom. All the construction debris has been removed from the garage and it's looking great! The kitchen is getting ready for new cabinets. Most rooms are about ready for a new coat of paint. The work on the deck is complete. Se


BELVIDERE PROJECT - WEST SEATTLE - WEEK 7
On to Week 7 at the Belvidere house and A LOT of sticks are up. All the framing in the basement is complete along with some unexpected, but necessary, sealing and drainage systems for the basement walls. Work has progressed a lot upstairs in the master as well. The ceilings were raised, the bathroom is framed including the tub and shower, and walls were premade for the new dormer. On the main floor the kitchen and bathroom subfloor was replaced as well as a drop ceiling


S AUGUSTA - COSMETIC FIXER - WEEK 5
Week 5. Putting on the finishing touches before cleaning, staging, and listing photos next week! The hardwood floors look great and the bedroom carpets are in. Most doors are up as well. In the kitchen the granite has been installed on the cabinets as well as a glass tile backsplash. New cabinet hardware is also on; just waiting for appliances. In the bathroom the shower and tub were refinished and look good, as well as a new vanity and vinyl floors. Paint is new throu


BOTHELL 183RD FIXER - WEEK 3
Wow - the holidays certainly didn't slow down the contractors! A huge amount of work has been accomplished by the contractors over the last couple of weeks! The old doors have been removed and are in the process of being replaced with all new ones. Lots of window framing in various rooms. New drywall in the kitchen, which is taking shape! New tile is being installed in the upstairs bathroom. Lots of new drywall downstairs, too, in the living area and the bathroom which is u