Week 4. It's getting close to complete now. The hardwood floors are in, the trim is up and painted, the doors are all painted, and the french doors were installed between the bonus room and living room. Also a lot of priming...
The project is just getting under way. Most of the demolition work is completed. The kitchen has been gutted and some walls have been removed to open up the floorplan. The family room fireplace is receiving a complete facelift. Check out al...
Landscaping was in progress when I arrived on Saturday afternoon. The front door has been painted a dark brown. The stair treads are in the process of being sanded and the risers are painted white. Handrails have been installed. The kitchen is gorgeous! Th...
Week 3 brought a lot of patching and some sheet rocking on the walls. We also got all new fan-heaters replacing the old baseboard heat. A lot of prep work to get ready for trim and paint. Also the new shingles were installed on the front of...
Exterior painting has been completed and looks great. There is also a new garage door. Inside, the kitchen is taking shape. Kitchen cabinets were installed with granite counter tops. The vanities in the main bathroom and master bathroom are in. The master...
Week 3 on the Belividere Project House in West Seattle has brought new windows and a full HVAC system. The windows are vinyl that are dark on the outside to keep with the style of the house, but the inside is white so they look really c...
Week 2 brought a lot of progress! Huge changes to the yard with load after load of brush, blackberries, and junk being hauled off. The ramp out front has been fully removed and the siding cut in preparation for some shake siding to add curb appeal...
This project turned out beautiful! The home is now listed. There is a new front porch and circular driveway, since the last time I visited this property. Click here to view all the photos of this property. The listing information can be found...
Demo just began on this South Seattle cosmetic fixer. Due up are new floors, counters and sinks, paint inside and out, appliances, doors, hardware, trim, heaters, french doors between the living room and bonus room, a portico out front, general cleanup, and some major...
The crew was installing a new roof and started painting the exterior of this home when I arrived on Saturday afternoon. Inside the house, tile was being laid on the floor of the new basement bathroom. Water resistent, backerboar...