February 27, 2012

 A new project in the Mt. Baker neighborhood.  This one is a FULL remodel.  The demo is in progress, the house is being taken down to the studs and then some.  Some of the original layout is changing, so follow the process over the weeks.  Right now the entrance is on...

February 26, 2012

 This new project is 3000 sq ft and is located on an established residential street in the north end of Seattle. The home is on a quiet street yet has easy access to I-5. This project is a full remodel. Demo has been completed. New rooms in the basement are being frame...

February 18, 2012

 Week 14 of the Belvidere projects, and a lot of changes since our last update.  All the rough work is basically complete and sheet rock is already going up.  All the plumbing, electrical, insulation, windows, siding, roof, new dormer, bathrooms, and kitchen are ready...

February 8, 2012

The tiling in the downstairs bathroom and laundry room is complete.  The big change this week is the finished hardwoods throughout the top floor.  They are looking fabulous!  Check out all the pictures of this project here.

February 1, 2012

The texturing turned out great and with all the interior painting done, the house looks amazing! Check out the new granite countertops on top of all new cabinets.  The tile floor in the kitchen is done.  The upstairs living room fireplace has been tiled.  Carpet has be...

Please reload

Featured Posts

HARD MONEY MARKET REPORT: JANUARY 2013

January 3, 2013

1/2
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2016 All rights reserved. 

14508 NE 20th St. #200 Bellevue WA 98007 I 425-881-5131

  • Facebook - White Circle