LYNNWOOD FIXER - WEEK 7

November 28, 2011

 Interior paint and a new front door!

 Lots of progress the past couple weeks at the Lynnwood house. A new front door welcomes you. Inside, the interior walls have been textured and painted. Backerboard has been installed in the master bathroom and main bathroom floors, indicating tile will be installed soon. The living room fireplace has backerboard as well. There is a new exterior door in the back of the home that opens to the basement. New vents were installed in the back of the home and the furnace is now operating. Also, a frost free, outdoor faucet was installed for backyard watering. The deck on the back of this home received new railing. Click here to see all the photos for this project.

 

Please reload

Featured Posts

HARD MONEY MARKET REPORT: JANUARY 2013

January 3, 2013

1/2
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2016 All rights reserved. 

14508 NE 20th St. #200 Bellevue WA 98007 I 425-881-5131

  • Facebook - White Circle