S AUGUSTA - COSMETIC FIXER - WEEK 2

December 10, 2011

 

Major yard progress!

Week 2 brought a lot of progress!  Huge changes to the yard with load after load of brush, blackberries, and junk being hauled off.  The ramp out front has been fully removed and the siding cut in preparation for some shake siding to add curb appeal.  Also trim has been added to the front windows.  Inside we got new doors installed including a nice front door with window, the door was cut into the bonus room, the entryway was cut wider, the old bonus room door was framed closed, and a lot of trim as been installed.  Click here to see the pictures from week 2.

Please reload

Featured Posts

HARD MONEY MARKET REPORT: JANUARY 2013

January 3, 2013

1/2
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2016 All rights reserved. 

14508 NE 20th St. #200 Bellevue WA 98007 I 425-881-5131

  • Facebook - White Circle