BELVIDERE PROJECT - WEST SEATTLE - WEEK 7

January 6, 2012

 

On to Week 7 at the Belvidere house and A LOT of sticks are up.  All the framing in the basement is complete along with some unexpected, but necessary, sealing and drainage systems for the basement walls.  Work has progressed a lot upstairs in the master as well.  The ceilings were raised, the bathroom is framed including the tub and shower, and walls were premade for the new dormer.  On the main floor the kitchen and bathroom subfloor was replaced as well as a drop ceiling  in the kitchen to make room for plumbing from the new master  bath.  Outside there is nice, new siding.  Coming soon is plumbing and master bedroom expansion.  Click here to see the pictures from the new updates.

Please reload

Featured Posts

HARD MONEY MARKET REPORT: JANUARY 2013

January 3, 2013

1/2
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2016 All rights reserved. 

14508 NE 20th St. #200 Bellevue WA 98007 I 425-881-5131

  • Facebook - White Circle