BELVIDERE PROJECT - WEST SEATTLE - WEEK 7


On to Week 7 at the Belvidere house and A LOT of sticks are up. All the framing in the basement is complete along with some unexpected, but necessary, sealing and drainage systems for the basement walls. Work has progressed a lot upstairs in the master as well. The ceilings were raised, the bathroom is framed including the tub and shower, and walls were premade for the new dormer. On the main floor the kitchen and bathroom subfloor was replaced as well as a drop ceiling in the kitchen to make room for plumbing from the new master bath. Outside there is nice, new siding. Coming soon is plumbing and master bedroom expansion. Click here to see the pictures from the new updates.