Two weeks since the last visit and so much progress to report on! The side entrance has been closed and the main entrance is being moved to the front, where it used to be at some point in time. There is a lot of framing work being done both on the external walls around the windowns and on the inside where the layout of the house will be completely different than it was for a much better flow. Check out all the pictures here to see how the project is coming along.