LATONA FIXER - WEEK 4
March 18, 2012


Siding work continues on the outside of this home. The steps to the front door are in the process of being repaired. New ducting and plumbing is being installed inside. The existing door to the master bedroom has been removed making way for the new master suite. The furnace is operational and this home is toasty warm! :-) A new hallway was framed leading to the attic study. Take a look at the photos of this project.
Please reload
Featured Posts
Please reload
Recent Posts
Please reload
Archive
Please reload
Search By Tags
I'm busy working on my blog posts. Watch this space!
Please reload