LATONA FIXER - WEEK 4

March 18, 2012

 

 Siding work continues on the outside of this home. The steps to the front door are in the process of being repaired. New ducting and plumbing is being installed inside. The existing door to the master bedroom has been removed making way for the new master suite. The furnace is operational and this home is toasty warm! :-) A new hallway was framed leading to the attic study. Take a look at the photos of this project.

 

Please reload

Featured Posts

HARD MONEY MARKET REPORT: JANUARY 2013

January 3, 2013

1/2
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2016 All rights reserved. 

14508 NE 20th St. #200 Bellevue WA 98007 I 425-881-5131

  • Facebook - White Circle