MT. BAKER PROJECT WEEK 7

April 17, 2012

Almost time for another visit, these are the pictures from last week (Week 7) The porch is turning out fantastic and is giving this home a completely new look.  The electrician has made great progess.  There are still some drainage pipes on the south side of the home that need to be completed before the driveway can be poured, but one of the walls has been finished.  Lot of work on the back yard redoing the steps from the driveway to the back entrance.  See all the progess pictures here.

 