MT. BAKER PROJECT - WEEK 8

April 20, 2012

 

 

The driveway has been poured as well as the steps leading up to the backyard.  The plumbing and electric has been signed off and the framing inspection is about to happen, too.  The house is being prepped for siding!  Check out this weeks pictures here.