MT. BAKER PROJECT - WEEK 8
April 20, 2012


The driveway has been poured as well as the steps leading up to the backyard. The plumbing and electric has been signed off and the framing inspection is about to happen, too. The house is being prepped for siding! Check out this weeks pictures here.
Please reload
Featured Posts
Please reload
Recent Posts
Please reload
Archive
Please reload
Search By Tags
I'm busy working on my blog posts. Watch this space!
Please reload