MT. BAKER WEEK 12 AND 13 UPDATES

May 24, 2012

 

I wasn't able to get into the house during week 12, but the main change on the outside showed the driveway re-poured and a walkway added from the lower steps to the porch steps.  During week 13 the walls have been painted with a pre-texture primer.  See all the pictures here.

 

Please reload

Featured Posts

HARD MONEY MARKET REPORT: JANUARY 2013

January 3, 2013

1/2
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2016 All rights reserved. 

14508 NE 20th St. #200 Bellevue WA 98007 I 425-881-5131

  • Facebook - White Circle