MT. BAKER WEEK 12 AND 13 UPDATES
May 24, 2012


I wasn't able to get into the house during week 12, but the main change on the outside showed the driveway re-poured and a walkway added from the lower steps to the porch steps. During week 13 the walls have been painted with a pre-texture primer. See all the pictures here.
Please reload
Featured Posts
Please reload
Recent Posts
Please reload
Archive
Please reload
Search By Tags
I'm busy working on my blog posts. Watch this space!
Please reload