LYNNWOOD FIXER - WEEK 9

December 13, 2011

Take a look!

 

 Exterior painting has been completed and looks great. There is also a new garage door. Inside, the kitchen is taking shape. Kitchen cabinets were installed with granite counter tops. The vanities in the main bathroom and master bathroom are in. The master bathroom shower floor is prepped. Closet doors in the master bedroom are in place. The stairs leading to the basement have been sanded. The basement bathroom has a tiled shower stall and a beautiful new double sink vanity with a granite counter top. Vinyl has been laid in the laundry/utility room. The basement fireplace got flagstone too! :-) 
Click here to see all the photos of this project.

 

Please reload

Featured Posts

HARD MONEY MARKET REPORT: JANUARY 2013

January 3, 2013

1/2
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2016 All rights reserved. 

14508 NE 20th St. #200 Bellevue WA 98007 I 425-881-5131

  • Facebook - White Circle